Completed · August 2025–May 2026
ARES autonomous cooperative rover system
I modeled the drivetrain, designed its interface PCB, and helped build and test an operational rover for a cooperative robotics capstone.

- My role
- Powertrain Engineer
- Disciplines
- Robotics · Mechanical · Electrical · Systems · Test
- Team size
- Approx. 25
- Tools
- MATLAB · Altium Designer
Objective and scope
ARES was a CU Boulder senior capstone to develop an autonomous system of three to five cooperating rovers. About 25 students worked across subteams of roughly four to five people. We built and tested one operational rover. Multi-rover cooperation remained a design objective.
Integrated system demonstration
This footage shows the rover turning between obstacles, crossing a wooden obstacle, and approaching a marked target. The layout changes during filming. The wide-angle clip gives a broader view of the course. Both videos are silent and include visual descriptions.
Integrated rover demonstration · 1.5× speed
Read the visual description for Integrated rover demonstration · 1.5× speedObstacle course overview · 2× speed
Read the visual description for Obstacle course overview · 2× speedThe clips are shown at their supplied 1.5× and 2× speeds. The measurements in the verification section come from the team’s test records.
System requirements
These requirements come from the team’s first and third design reviews. They guided design and test planning. The measurements from the final review are listed separately below.
| Area and ID | Requirement or objective | Design review and evidence |
|---|---|---|
| System endurance · 1.1.3 / 1.3.3 | Rover and power system capable of at least 60 minutes of operation. | DR3 design requirement. Endurance verification is unconfirmed. |
| Frame · 1.2.1 / 1.2.2 | Support operating loads and provide secure mounting for sensors and hardware. | DR1 design requirements. |
| Mobility · 1.4.1 | Reach unobstructed positions in an empty two-dimensional space. | DR1 and DR3 design requirement. |
| Obstacle traversal · 1.4.2 | Traverse a rigid obstacle of 2.5 cm. | DR1 and DR3, also listed as chassis requirement 1.2.3 in DR3. Final team measurement was 7.5 cm. |
| Motion state · 1.4.3 | Measure and report motion states in real time to command and data handling and guidance and navigation. | DR1 design requirement. |
| Cooperation · 1.5.6 | Support a cooperative architecture among rovers. | DR1 design requirement. Multi-rover verification remains open. |
| Mission timing · 1.5.12 | At least one rover reaches the target of interest within 60 minutes. | DR3 mission objective. Full-mission verification remains open. |
| Communications · 1.6.4 | Wirelessly communicate rover state to the rover network. | DR1 design requirement. Multi-rover network behavior remains unverified. |
My contribution
I developed the initial MATLAB torque models to estimate motor loads and support component selection. The broader project team continued using the model throughout the capstone as a foundation for drivetrain analysis. I taught myself Altium Designer and designed the drivetrain interface PCB implemented on the rover. I assembled two powertrains, designed the powertrain verification tests, and worked with teammates to conduct the tests and evaluate the results. I also contributed to design reviews and explained the reasoning behind our choices.
From requirements to drivetrain design
The model connected the terrain and motion goals to motor loading. Rover mass, wheel radius, friction, acceleration, and load distribution all affected the torque estimate. The early concept used six wheels. The final rover used four, so the loads had to be interpreted for a different configuration. Later, the team used free-body diagrams and a 1,000-sample Monte Carlo analysis to examine sensitivity to motor torque, friction, rolling resistance, drivetrain efficiency, and center-of-gravity height.
Hardware and interfaces
The wooden drivetrain prototype and wired breadboard show the early mechanical and electrical work separately. The interior CAD and integrated electronics photograph show those interfaces in the context of the rover assembly.
Rover mobility demonstration · original speed
Read the visual description for Rover mobility demonstration · original speedDrivetrain interface PCB
This was my first PCB. I took responsibility for an interface board that connected existing motor-driver modules to power, motor commands, and encoder feedback. The submitted design has four motor channels with PWM and direction signals, encoder connections to the STM32 interface, XT30 and XT60 battery connections, and five mounting holes. The submitted outline measures 111.78 × 78.23 mm.
The connector locations, mounting pattern, and need to reach the control and feedback signals shaped component placement. The routed view makes individual signal paths easier to follow. The copper-pour view shows how the layout uses the remaining copper area. The render shows the submitted mechanical arrangement.
The team implemented the drivetrain board. The expo portrait and reverse-side photograph show how the design translated into a manufactured part.
I also designed two carrier boards that did not reach fabrication or integration because the final STM32 pinouts arrived too late. That taught me to identify interface dependencies early and bring them into schedule discussions.
Experimental verification
I designed the powertrain verification tests to evaluate drivetrain performance against our requirements and compare the physical rover’s behavior with our analytical models. I worked with teammates to develop the test setups, execute tests, analyze data, and evaluate performance.
A teammate built the motor torque rig after we designed it together. The team used a pulley and lifted loads on the rig. For motion measurements, we used encoders and analyzed video recorded on phones with Tracker. DR3 describes a planned 10° acceleration rig condition and motor-load checks at about 0.216 N·m at maximum efficiency, 0.98 N·m at steady speed, and roughly 1.54 N·m briefly without stalling or overheating. These were planned test conditions. The final climb comparison uses a 7° minimum criterion.
The acceleration plot compares the team’s model with test points at different inclines.
Incline test footage
The test footage documents specific conditions. The team’s reported maximum climb is a separate result in the final review.
0° incline
Read the video transcript for 0° incline8.4° incline
Read the video transcript for 8.4° incline23.7° incline
Read the video transcript for 23.7° incline30° incline
Read the video transcript for 30° incline| Measurement | Team result | Reference |
|---|---|---|
| Climb angle | 33° | 7° minimum test criterion |
| Obstacle clearance | 7.5 cm | 2.5 cm requirement |
| Speed | 1.19 m/s | 1.0 m/s modeled estimate |
| Rover mass | 3.85 kg | 3.66 kg earlier CAD estimate |
| Final dimensions | 30 × 28 × 26.5 cm | Final review configuration |
Reflection
Designing the PCB showed me how circuit design and hardware interfaces affect integration and troubleshooting. It helped shape my decision to pursue graduate studies in electrical engineering.
On a team of 25, I contributed by taking ownership of the early torque models and learning PCB design. When teammates disagreed, laying out the facts, assumptions, and tradeoffs helped us make decisions together.
One of my favorite moments was gathering around the bench with teammates as the hardware came together. After working through the mechanical and electrical pieces separately, it was exciting to see them work together.
Bringing the rover to life · original speed
Read the visual description for Bringing the rover to life · original speedRelated work

Academic · Completed
MAXWELL CubeSat
Student Spacecraft Assembly, Integration and Test Engineer
- Aerospace
- Electrical
- Systems
- Test